Gearing Up For IMBRT

Important notice to take note of the pilot testing

0
962
Lebuhraya Sultan Iskandar
Lebuhraya Sultan Iskandar (image by Iskandar Malaysia BRT)

On 17th March, Iskandar Regional Development Authority (IRDA) has announced that the Iskandar Malaysia Bus Rapid Transit (IMBRT) project has entered the second phase and a three-month pilot testing programme which will be carried out along Lebuhraya Sultan Iskandar between Horizon Hill and Anjung in Medini is scheduled to take place.

In preparation for the upcoming pilot testing to take place along Lebuhraya Sultan Iskandar from 11th April to 8th July 2021, there will be lane closure of the fast lane in both directions of Lebuhraya Sultan Iskandar, at KM 4.4 for a stretch of 55 metres.

BRT Vehicle Conceptual Design
BRT Vehicle Conceptual Design For Direct and Feeder Services